It’s no longer possible to move Contents Menu items up and down in SAB > Contents > Contents Items and Screens. Not sure if this is has been like this for a while, but I and another colleague have observed it in SAB 8.6.5 on Windows. Would be great if this can be fixed.
Same goes for Book order in a book collection.
I think there is an issue with drag 'n drop in the SAB interface in general.
Yes, sorry, table reordering stopped working after we bundled the latest Java JRE with the build. This has been fixed now, ready for the next release of Scripture App Builder.
1 Like
Sounds great, thank you Richard.